You can run a data sync (synchronization) job.
Note:
The Run Data Sync job can also be run via TrialMaster via the Export History
page (Run > Export).
To run a data sync job:
1. Access the Trial Configuration page. (See Configure a Trial for guidance.)
2. Click the DataModel/Reporting tab.
3. Click the Run Data Sync button. A confirmation message displays at the top that the data sync job was completed.